DILKOM BULGARIA EOOD signed a contract No. BG-RRP-3.008-0799-C01 for the provision of a financial grant under procedure BG-RRP-3.008 "Support for the transition to a circular economy in enterprises".
The main objective of the project is to contribute to the acceleration of the transition to a circular economy, by providing grants to an enterprise from the manufacturing sector to introduce circular models for the use of resources and the implementation of climate-neutral methods and technologies for the production and consumption of the products of his activity.
The main action is the acquisition of new technologies for the introduction of circular models in the enterprise.
The expected effect on the candidate enterprise is to transform its production processes by switching to circular models to increase resource efficiency and limit greenhouse gas emissions.
Total value of the project: BGN 1,300,000.00, of which BGN 650,000.00 is European funding from the Recovery and Resilience Facility (RRF).
Start date: 20/05/2024
End date: 20/11/2025
DILCOM BULGARIA Ltd. signed a contract No. BG-RRP-3.006-0195-C01 for the provision of a financial grant under procedure BG-RRP-3.006 "Construction of new RES for own consumption in combination with local facilities for energy storage in enterprises".
The main objective of the project is to promote the transition of a private enterprise to eco-friendly activity through the construction of renewable energy sources (RES) for own consumption, combined with local energy storage facilities.
The main activity is the construction of a new photovoltaic installation with a capacity of 190kW for the production of energy from renewable sources for own consumption in combination with local energy storage facilities (batteries) with a capacity of 278.4 kWh.
The expected effect is to accelerate the transition to climate neutrality by improving the energy efficiency and independence of the applicant.
The investment proposal does not contain activities to facilitate the closure of uncompetitive coal mines in accordance with Council Decision 2010/787/EU.
Total value of the project: BGN 570,000.00, of which BGN 285,000.00 are European co-financing.
Start date: 11/10/2023
End date: 10/05/2025
DILCOM BULGARIA Ltd. signed a contract No BG16RFOP002-6.002-0135 -C01 for the provision of a financial grant under the procedure BG16RFOP002-6.002 "Recovery of SMEs through energy efficiency improvement".
The main objective of the project proposal is to deliver focused support to Bulgarian SMEs to recover from the economic impact of the spread of the COVID-19 pandemic by improving their energy efficiency.
The main action taken for the project is investment in improving their energy efficiency.
The results achieved from the implementation of the project consist of the introduction of energy-efficient measures to recover from the economic impact of the spread of the COVID-19 pandemic, which will help DILCOM BULGARIA Ltd. remain competitive and continue the development of its activities in a resource-efficient and environmentally friendly way.
Total value of the project: BGN 273, 263.00 of which BGN 136, 631.50 are European co-financing from ERDF.
Start date: 21.09.2022
End date: 21.07.2023.
Dilcom Bulgaria Ltd. signed a contract № BG16RFOP002-2.040-0212-C01 for the provision of a financial grant under the procedure BG16RFOP002-2.040 “Enhancement of production capacity in SMEs”.
The main project goal is to improve Dilcom’s production capacity:
- Achieve guaranteed technical capability for the automation and optimization of finishing operations in label printing;
- Enhance the capacity of the existing business site in regards to the produced labels – foil and paper, self-adhesive and non-adhesive, in order to satisfy market demands;
- Improve the quality of the following stages of the production process - die cutting, cutting and arranging of labels - and hence the finished product;
- Reduce the cost of products by reducing production costs and optimizing production operations;
- Expand market positions by attracting new customers nationally and internationally.
These objectives will be met as a result of the investment in a Multifunctional machine for finishing processes.
You can view the entire document in Bulgarian.